{"id":4980,"date":"2023-05-08T13:29:59","date_gmt":"2023-05-08T11:29:59","guid":{"rendered":"https:\/\/www.lca-sued.at\/projekt\/food-processing-and-logistics-center-completed\/"},"modified":"2023-05-08T13:36:10","modified_gmt":"2023-05-08T11:36:10","slug":"food-processing-and-logistics-center-completed","status":"publish","type":"projekt","link":"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/","title":{"rendered":"Food processing and logistics center -completed"},"content":{"rendered":"<p><strong>The content of the project is the implementation of a feasibility study for the construction of a food processing and logistics center at the location of the LCA-S\u00fcd in F\u00fcrnitz. Project status: completed.<\/strong><\/p>\n<p>In the project funded by the KWF K\u00e4rntner Wirtschaftsf\u00f6rderungsfonds, the market and the technology have been analyzed with regard to a food processing and logistics center, a concept for the operational organization or a building concept is to be drawn up and, in a final step, a business plan and a recommendation for action have been defined.<\/p>\n<p>The project was carried out in two phases, with a termination or exit scenario having been defined after the completion of the first phase. The first phase provided information on whether the need for a center in Carinthia was big enough to operate profitably.<\/p>\n<p><strong>Description<\/strong><\/p>\n<p>Cultivation, production, processing, refining, distribution, logistics and disposal of food is by far the largest market in the world. The demands on the quality and shelf life of food are increasing rapidly. In addition, trade and consumers are becoming increasingly sensitive when it comes to the sustainability, naturalness and regionality of products. At the same time, around 200 million tons of food are wasted in Europe every year. The transport for further processing, especially between the northern and southern countries, and the associated pollutant emissions are constantly increasing. Small producers and regional companies in the food sector are supported, but internationalization measures are still difficult due to the size of the company. Mergers of such companies, such as cooperatives, are not always possible.<\/p>\n<p>This situation calls for action. Innovative mergers and cooperation between companies in combination with the use of modern techniques and technologies can provide a solution to counteract the negative effects of global value chains. Above all, the interaction of regionally based companies from different areas (e.g. microelectronics, mechanical engineering, research and development, construction, food producers) not only has a positive effect on the environment, but also on value creation in Carinthia.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Goal<\/strong><\/p>\n<p>The aim was to develop a well thought-out concept for a logistics and processing center for food, which can be presented to potential operators.<\/p>\n<p><b>\u00a0Duration of project:<\/b><\/p>\n<p>08\/03\/2020 &#8211; 03\/30\/2023<\/p>\n<p><strong>Project partner:<\/strong><\/p>\n<ul>\n<li>LCA Logistik Center Austria S\u00fcd GmbH<\/li>\n<li>Competence Group &#8211; consists of the 6 Carinthian companies G&amp;H Civil Engineering GmbH, Ortner Reinraumtechnik GmbH, Oswald GmbH, PMS Elektro- und Automationstechnik GmbH, SMB Pure Systems GmbH and M. WULZ Anlagenbau GmbH<\/li>\n<li>City of Villach<\/li>\n<\/ul>\n","protected":false},"featured_media":0,"template":"","class_list":["post-4980","projekt","type-projekt","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Food processing and logistics center -completed - LCA SUED<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Food processing and logistics center -completed - LCA SUED\" \/>\n<meta property=\"og:description\" content=\"The content of the project is the implementation of a feasibility study for the construction of a food processing and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/\" \/>\n<meta property=\"og:site_name\" content=\"LCA SUED\" \/>\n<meta property=\"article:modified_time\" content=\"2023-05-08T11:36:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lca-sued.at\/wp-content\/uploads\/2022\/02\/lca-slider-2022.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"486\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/\",\"url\":\"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/\",\"name\":\"Food processing and logistics center -completed - LCA SUED\",\"isPartOf\":{\"@id\":\"https:\/\/www.lca-sued.at\/#website\"},\"datePublished\":\"2023-05-08T11:29:59+00:00\",\"dateModified\":\"2023-05-08T11:36:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/www.lca-sued.at\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projekte\",\"item\":\"https:\/\/www.lca-sued.at\/projekt\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Food processing and logistics center -completed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.lca-sued.at\/#website\",\"url\":\"https:\/\/www.lca-sued.at\/\",\"name\":\"LCA SUED\",\"description\":\"LCA SUED\",\"publisher\":{\"@id\":\"https:\/\/www.lca-sued.at\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.lca-sued.at\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.lca-sued.at\/#organization\",\"name\":\"LCA SUED\",\"url\":\"https:\/\/www.lca-sued.at\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.lca-sued.at\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.lca-sued.at\/wp-content\/uploads\/2017\/08\/lca_logo.png\",\"contentUrl\":\"https:\/\/www.lca-sued.at\/wp-content\/uploads\/2017\/08\/lca_logo.png\",\"width\":167,\"height\":108,\"caption\":\"LCA SUED\"},\"image\":{\"@id\":\"https:\/\/www.lca-sued.at\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/lca-south\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Food processing and logistics center -completed - LCA SUED","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/","og_locale":"en_US","og_type":"article","og_title":"Food processing and logistics center -completed - LCA SUED","og_description":"The content of the project is the implementation of a feasibility study for the construction of a food processing and [&hellip;]","og_url":"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/","og_site_name":"LCA SUED","article_modified_time":"2023-05-08T11:36:10+00:00","og_image":[{"width":1024,"height":486,"url":"https:\/\/www.lca-sued.at\/wp-content\/uploads\/2022\/02\/lca-slider-2022.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/","url":"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/","name":"Food processing and logistics center -completed - LCA SUED","isPartOf":{"@id":"https:\/\/www.lca-sued.at\/#website"},"datePublished":"2023-05-08T11:29:59+00:00","dateModified":"2023-05-08T11:36:10+00:00","breadcrumb":{"@id":"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.lca-sued.at\/en\/projekt\/food-processing-and-logistics-center-completed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.lca-sued.at\/en\/"},{"@type":"ListItem","position":2,"name":"Projekte","item":"https:\/\/www.lca-sued.at\/projekt\/"},{"@type":"ListItem","position":3,"name":"Food processing and logistics center -completed"}]},{"@type":"WebSite","@id":"https:\/\/www.lca-sued.at\/#website","url":"https:\/\/www.lca-sued.at\/","name":"LCA SUED","description":"LCA SUED","publisher":{"@id":"https:\/\/www.lca-sued.at\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lca-sued.at\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.lca-sued.at\/#organization","name":"LCA SUED","url":"https:\/\/www.lca-sued.at\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.lca-sued.at\/#\/schema\/logo\/image\/","url":"https:\/\/www.lca-sued.at\/wp-content\/uploads\/2017\/08\/lca_logo.png","contentUrl":"https:\/\/www.lca-sued.at\/wp-content\/uploads\/2017\/08\/lca_logo.png","width":167,"height":108,"caption":"LCA SUED"},"image":{"@id":"https:\/\/www.lca-sued.at\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/lca-south\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.lca-sued.at\/en\/wp-json\/wp\/v2\/projekt\/4980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lca-sued.at\/en\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/www.lca-sued.at\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:attachment":[{"href":"https:\/\/www.lca-sued.at\/en\/wp-json\/wp\/v2\/media?parent=4980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}